Resurfacing challenge in Cumberland County
Roadwork on Interstate 81
The Pennsylvania Division of Transportation (PennDOT) says {that a} 12.85-mile resurfacing challenge on Interstate 81 in East Pennsboro and Hampden Townships, Cumberland County, is scheduled to renew Sunday, March 19. The beginning date was initially set for Sunday, March 12. Climate allowing, night time work will start Sunday, March 19. The contractor is scheduled to carry out milling and paving from 8:00 pm to six:00 am in each instructions of I-81 from Route 11/15 (Mile 65) to the exit to Camp Hill/Route 581 (Mile 59). There will probably be nightly lane closures. Day work will start Monday, March 20. The contractor is scheduled to put in drainage pipe alongside the interstate from a couple of mile south of Route 11/15 (Mile 64) to a couple of mile north of Route 944 ( Miles 62). There will probably be day by day shoulder closures in each instructions from 7:00 am to 4:00 pm Motorists needs to be alert and drive with warning by means of the work zone. This work is a part of a 12.85-mile resurfacing challenge that consists of milling, base substitute, concrete pavement patching, minor drainage, ADA ramps, paving, visitors counter website restore and different miscellaneous building on Interstate 81 from Route 15/Enola in East Pennsboro Township, to Route 581/Lambs Hole Street in Hampden Township. This challenge is predicted to be accomplished by Nov. 21, 2023.
The Pennsylvania Division of Transportation (PennDOT) says {that a} 12.85-mile resurfacing challenge on Interstate 81 in East Pennsboro and Hampden Townships, Cumberland County, is scheduled to renew Sunday, March 19. The beginning date was initially set for Sunday, March 12.
Climate allowing, night time work will start Sunday, March 19. The contractor is scheduled to carry out milling and paving from 8:00 pm to six:00 am in each instructions of I-81 from Route 11/15 (Mile 65) to the exit to Camp Hill/Route 581 (Mile 59). There will probably be nightly lane closures.
Day work will start Monday, March 20. The contractor is scheduled to put in drainage pipes alongside the interstate from a couple of mile south of Route 11/15 (Mile 64) to a couple of mile north of Route 944 (Mile 62). There will probably be day by day shoulder closures in each instructions from 7:00 am to 4:00 pm
Motorists needs to be alert and drive with warning by means of the work zone.
This work is a part of a 12.85-mile resurfacing challenge that consists of milling, base substitute, concrete pavement patching, minor drainage, ADA ramps, paving, visitors counter website restore and different miscellaneous building on Interstate 81 from Route 15/Enola in East Pennsboro Township, to Route 581/Lambs Hole Street in Hampden Township.
This challenge is predicted to be accomplished by Nov. 21, 2023.